autocar-logo
Delhi
Fallback ad for 970x90

Delhi-Meerut, Eastern Peripheral Expressways inaugurated

Both are meant to curb traffic and pollution in Delhi and NCR; completed Delhi-Meerut Expressway to reduce travel time from 4-5 hours to 45min.
2 min read28 May '18
Rivan RS Rivan RS
21K+ views

A representative map of the Eastern Peripheral Expressway.

Fallback ad for 728x90

Two new expressways have been inaugurated by the Prime Minister of India in the National Capital Region on Sunday. The first is Phase 1 of the Delhi-Meerut Expressway and the second is the Eastern Peripheral Expressway (EPE).

The former is a part of a 14-lane expressway that starts at the Nizamuddin Bridge and goes until the Uttar Pradesh border. While scheduled to be completed in 30 months, this phase of the Delhi-Meerut Expressway was completed in a shorter span of 18 months. This Rs 841-crore phase has a six-lane expressway with two eight-lane highways, one on each side (a total of 14 lanes for vehicles), a 2.5m-wide cycle track, and a 1.5m-wide footpath. Vertical gardens with solar panels for lighting and drip water irrigation feature on the expressway, along with replicas of monuments like the Qutub Minar and Ashoka Stambh. In terms of safety and monitoring systems, the expressway is equipped with Advanced Traffic Management Systems (ATMS) and CCTVs.

While the first phase reduces travel time from 45min to just 8min (thanks, in part, to the 120kph speeds that are now achievable), the completed expressway is expected to drop travel time between Delhi and Meerut to 45min, from the current 4-5 hours.

The Eastern Peripheral Expressway’s primary aim is to curb traffic and pollution in Delhi by redirecting two lakh vehicles around the national capital on a daily basis. Built at a cost of Rs 11,000 crore and in a record 17 months, the 135km-stretch of expressway is expected to bring down pollution levels in Delhi by 27 percent and is India's first highway to be lit by solar power. There are also provisions for rainwater harvesting every 500m. The EPE also gets a smart and intelligent highway traffic management system, video incident detection system, and an Electronic Toll Collection (ETC) system.

Fallback ad for 728x90
Fallback ad for 728x90

2018 XUV500 top variant most in demand

Updated design and new alloys are what’s pulling in buyers.
1 min read28 May '18
Shubham ParasharShubham Parashar
Fallback ad for 728x90

2018 Volvo XC40 production to be expanded as demand grows

Volvo has received close to 80,000 orders for its new SUV; production will be boosted in Europe and China to meet demand.
1 min read28 May '18
Autocar India News DeskAutocar India News Desk
Fallback ad for 728x90

1967 Ford Shelby GT500 Super Snake makes a comeback

Limited to 10 units, the muscle car’s continuation model packs a 550hp 7.0-litre V8.
1 min read27 May '18
Autocar India News DeskAutocar India News Desk
Fallback ad for 728x90

Jaguar XK to make a comeback

New XK unlikely to be launched until 2021, will be preceded by 2019 F-Type replacement.
3 min read27 May '18
Autocar India News DeskAutocar India News Desk

The XKR previously sold in India.

Fallback ad for 728x90

Mahindra TUV300 Plus launched at Rs 9.69 lakh

Mahindra officially announces pricing for the TUV300 Plus P4 variant; comes with a 2.2-litre 120hp diesel mated to a six-speed manual gearbox; gets fuel-saving Micro-Hybrid tech.
2 min read26 May '18
Akbar MerchantAkbar Merchant
Fallback ad for 728x90
Delhi-Meerut, Eastern Peripheral Expressways inaugurated - Introduction | Autocar India