autocar-logo
Delhi

Mumbai Coastal Road Project Phase 1 inaugurated today

The 9.5km stretch from Worli to Marine Drive will open to traffic tomorrow morning.
2 min read11 Mar '24
Rivan RS Rivan RS
Mumbai Coastal Road Project tunnel

The Mumbai Coastal Road Project (MCRP), also dubbed the Dharamveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Coastal Road, has been inaugurated today by Maharashtra Chief Minister Eknath Shinde. Phase 1, which is the south-bound arm of the coastal road from Worli to Marine Drive and stretches 9.5km – the total length of the road is 10.58km – will open to traffic on Tuesday morning.

  1. Worli to Marine Drive stretch of MCRP to open 8am tomorrow
  2. To be open for traffic only between 8am and 8pm on weekdays
  3. Entry from Worli Seaface, Haji Ali and Amarsons Garden (Breach Candy)
  4. Speed limit set at 80kph; 2.07km-long tunnel section has a limit of 60kph

Mumbai Coastal Road Project opening, timings

As the Rs 12,721 crore project, construction for which began in October 2018, is still to be completed in its entirety, the Mumbai police has announced that traffic will only be allowed between 8am and 8pm on weekdays. Construction on the project will continue at night and over the weekend. The north-bound stretch is expected to open to traffic in May this year. Work on the missing 1km bit that will connect the coastal road to the Bandra-Worli Sea Link will also continue.

MCRP opens

Of the three entry points to the south-bound arm of the coastal road – Worli Seaface, Haji Ali and Amarsons Garden – the Worli one, also called Bindu Madhav Thackeray Junction, will only be accessible from 8am to 5pm. There are exits at Amarsons Garden and at Marine Drive, specifically the Princess Street flyover; to reach the latter, one must traverse a 2.07km tunnel that starts at Breach Candy’s Priyadarshini Park, extends south under Girgaon Chowpatty and Malabar Hill, and ends between the Hindu and Islam Gymkhana.

Mumbai Coastal Road Project speed limits, vehicles

While most of the MCRP will have a speed limit of 80kph, speed in the tunnel section will be limited to 60kph, while cars will have to adhere to the 40kph limit at the interchanges. All heavy vehicles, other than BEST and ST buses, will be banned from entering the coastal road, as will all pedestrians, two-wheelers and three-wheelers.

MCRP map
Maharashtra CM Eknath Shinde with deputy CMs Ajit Pawar and Devendra Fadnavis, inspecting the map of the MCRP.

There is also a plan to have a central park covering an area of 320 acres that will be developed along the route of the Dharamveer Sambhaji Maharaj Coastal Road.

To read more about the coastal road, grab the latest copy of Autocar India, on stands now.

IMAGE SOURCE

Tata Motors rolls out 10 lakh cars from Sanand plant

Tata Motors rolled out its one-millionth car from its Sanand facility in Gujarat
3 min read11 Mar '24
Ajit DalviAjit Dalvi
Tata Tiago Sanand plant

We see India's growth coming from Tier 2, Tier 3 markets: Mercedes' region overseas head

With cumulative annual volumes crossing 17,000 units in 2023, India has become the fifth-largest overseas market for German luxury carmaker Mercedes-Benz, and the brand is bullish about our country...
2 min read7 Mar '24
Mayank Dhingra Mayank Dhingra
Mercedes-Benz's Landmark showroom, Sagree Sardien

Euro NCAP to award higher safety rating to cars with fewer screens

Touchscreens in cars were quite a novelty when they were first introduced, but in just a few years, they have completely taken over car interiors
2 min read6 Mar '24
Saptarshi MondalSaptarshi Mondal
Mercedes hyperscreen touchscreen problems

Over 80,000 electric scooters sold in February 2024

Electric two-wheeler manufacturers sold 81,963 units in February 2024, which is 36 units more than January 2024 (81,927 units)
3 min read6 Mar '24
Ajit DalviAjit Dalvi
Ola S1 price, Bajaj Chetak sales February 2024.

Budget hatchback demand could rebound by 2026, says Maruti

The small car segment has been on a decline for years, but Maruti Suzuki is expecting a turnaround in 2026 with an improvement in the affordability factor
2 min read5 Mar '24
Kiran MuraliKiran Murali
Coastal road, Mumbai coastal road opening, coastal road project map - Introduction | Autocar India